The scheme involved widening the carriageway through this congestion black spot in Tonbridge Wells. A dual carriageway was constructed through this 1km roadway. Works included: earthworks, deep drainage, ducting & utility diversions, carriageway & footway construction as well as retaining walls and traffic islands and roundabouts. GHM groundworks was circa £2.5 million pounds and we were the main sub-contractor responsible for all the Civil Engineering works.
© 2024 GHM Groundworks Limited.Web design and development by GMDevs.co.uk.